Port-side production and warehouse

Port-side production and warehouse

Our production and warehouse are located directly on the quay at Muuga Port, enabling us to unload large shipments of steel straight from the vessel into our facilities. This setup eliminates the need for intermediate transport and provides a more controlled and time-efficient logistics process.
By integrating vessel access with production and storage infrastructure, we ensure consistent and reliable material flow. This setup supports demanding projects where timing, accuracy, and scale are critical.

  • Direct unloading from vessel to storage or processing
  • Minimized handling and reduced transit-related risks
  • Shorter lead times and improved logistics coordination
  • Designed for bulk steel handling and high-volume throughput

This location advantage strengthens our capacity to serve large-scale construction, manufacturing, and infrastructure projects. With full oversight of incoming material and faster transition into production, we improve efficiency across the entire supply chain.

For clients, this translates into reliable operations, faster material availability, and reduced reliance on external logistics. The close proximity of ship, storage, and production enables more precise project planning and execution.

Find Us:

Take a look at other latest news

exmet

Holiday opening hours

The Exmet Group companies will operate during the holiday season as follows: December 23rd and 31st: Shortened workdays (8 AM–2 PM) December 24th, 25th, 26th,

Read more »